The works are clearly taking longer than originally advised. I have made enquiries and received the following today:
“The sewer repair works have stopped temporary due to engineering difficulty with ground water ingress.
As a result, a site meeting has been arranged for Friday 21 December 2012 at 10am to agree alternative solution.
I shall provide you with an update after the meeting on Friday.”
Tags: Faggs Road, Feltham North