Faggs Road roadworks update

The works are clearly taking longer than originally advised.  I have made enquiries and received the following today:

“The sewer repair works have stopped temporary due to engineering difficulty with ground water ingress.

As a result, a site meeting has been arranged for Friday 21 December 2012 at 10am to agree alternative solution.

I shall provide you with an update after the meeting on Friday.”

Advertisements

Tags: ,


%d bloggers like this: